Our Splashground Projects (Water Playgrounds) and Shallowing of Swimming Pools



Trussville Spray park, Trussville, Alabama: 
Planning and Design to add a complete circulation system to an existing flow-away sprayground. Construction cost approximately $50,000.

City of Sevierville, Tennessee: (Master Plan Rendering)
Planning, design, and construction management for renovations to the existing 25-meter pool, and the additions of a play and spray pool, water play features and water slide and tower. Pool aspects by Markey and Associates, in association with Barge Waggoner Sumner & Cannon. Construction cost approximately $600,000 for pool aspects. Completed in 2008.

City of Gastonia, North Carolina: 
Planning and Design a new sprayground with a train theme, plus renovations to Lineberger Park. Construction cost estimated to be $230,000. Opening scheduled 2008.

Splashground, Wyoming, Ohio:  (Picture)
Planning and Design for a Dragon Theme splashground within this new family aquatic center.

Upgrades for Cameron Run Waterpark, Virginia  (Picture)
Planning and Design for "shallowing" an excessively deep area of an existing children's play pool. The deep area was filled and converted to a splashground to reduce the risks and guard requirements for this facility. Opened 2006.

Splashgrounds for Two Parks in Independence, Missouri: 
Planning, Design, and Project Administration by Markey and Associates for sprayground for Rotary Park and McCoy Park. Opened summer of 2005.

Farmland, Massachusetts  (Picture)
Master Plan for an outdoor playground with aquatic features.


Markey and Associates
Planning, Design & Engineering